SINGAPORE SEWAGE TREATMENT PLANT PROJECT


Products:Steel Pipe, Tee, Flange, Stub, Plate
Surface treatment Surtace Requirements: 
Extermal coating: Refer to specification G1.5FT.36, SYSTEM 22, 
Preparation: Blast Clean to Sa2.5 followed immediately by 25 microns DFT epoxy iron oxide two pack blast primer 
Primer:Two pack polyamide cured Epoxy Zinc Chromate /Phosphate Pimer 75 microns 
Undercoat:Two pack high build amine adduct cured epoxy 100 microns 
Finish Coat:Two pack aliphatic polyurethane 50 microns Gloss Finish.
Intermal Lining:Fusion bonded epoxy lining 500 microns as per AWWA C213
Standard:AP15L X42 Q355B;EN10253-1/EN1092-1 Q355B;
ASTM A312 316L.
Specifications:DN80MM--1800MM
 

Welding Strueture: 
Steel plates, steel pipes,pipe fittings and flanges are welded to each other into special shaped steel structures and prefabricated parts.
WPS (Welding Proceture Specfrcation),MPS(Manufacturing Procedure Specification),.ITP (Inspecion Testing Plan),
WPQR (Welding Procedure Qualification Report),Fabrication Drawing, Welding Map.MTC(Mill Testing Certificate),NDT Report(UT RT PT),Coating Inspecion Report.Dimension Report etc.